Construction · Project Detail

Hollis — Deck Resurfacing

Construction/Projects/Hollis — Deck Resurfacing

Hollis — Deck Resurfacing

CompletedOn Track
Job Number
PJ-3026
Address
82 Riverstone Way
Project Type
Deck & Hardscape
Salesperson
Marta Vega
Status
Completed
Contract Amount
$24,600
Start Date
May 8, 2026
Target Completion
Jun 11, 2026
Last saved May 8, 2026 by Marcus Hale

Construction Readiness

Ready for ConstructionSigned ContractPermit IssuedEngineering Plans ApprovedCustomer Selections FinalizedDeposit / Financing Received

Pool Specifications

Freeform
16' x 32'
512 sq ft
3.5'
6.0'
Curved tanning ledge on east side, 8' x 4'.

Equipment Selections

Pentair IntelliFlo VSF
Pentair Clean & Clear Plus 520
Raypak 264k BTU Natural Gas
Jandy iAquaLink
Pentair IntelliChlor IC40 salt cell.

Finish & Material Selections

6" glass mosaic — Ocean Blue (National Pool Tile)
Pebble Sheen — Aqua Blue
Travertine pavers
Ivory — tumbled finish
880 sq ft
Travertine bullnose — Ivory

Features & Upgrades

Sheer descent waterfall (3), deck bubblers (2).
Stacked stone fire bowl (2).
Granite top, Lynx 36" grill, sink.
ColorLogic 320 underwater (3), landscape path lighting (12).
Aluminum 4' pool fence — black, 180 LF.
None

Permits & Plans

Issued
BP-2026-04812
May 8, 2026
Approved
Soils report on file; rebar schedule per Engineer Stamp 04/2026.
Internal only — never appears on customer-facing documents.

Construction Notes

Site access via north driveway only. Verify spoils placement with homeowner before dig. Equipment pad set 18" off east wall.
Last edited by Marcus Hale · May 8, 2026

Build Instructions

Plumb 2.5" returns for waterfall. Pre-wire automation conduit during steel. Confirm tile pattern with customer before set.
Last edited by Marcus Hale · May 8, 2026

Scope Revision Notes

Addendum #1 — Added deck bubblers (2). Addendum #2 — Upgraded heater to 264k BTU.
Last edited by Marcus Hale · May 8, 2026